One Load at a Time

Though it seems the project is not making progress, Liesfeld has made a lot of headway on this project by completing the storm water management basin (SWMB).  The contractor has removed all of the trees and is in the process of removing all the stumps and rootmat.  We still have a long way to go, but a lot of progress has been made.  By the time students return for the Fall 2014 semester, construction of the new academic building foundation should be started.

Below is a load of dirt excavated from the SWMB.